A3: Automated Inspection of Precast / Volumetric Components
Background
Current Process:
Inspection of precast components (2D and volumetric) during pre-concreting and post concreting are carried out manually through visual inspection by the Resident Technical Officers (RTOs).
The inspection process is time consuming and additional manpower and time is required to rectify mistakes identified by the RTOs.
Requirements
General Requirements:
- Innovative solution for precast inspection to improve the productivity of the inspection processes by the RTOs
- Improve accuracy and quality of precast production works
- Reduce manpower and time loss due to rectification works
Challenge
HDB Call for Proposals: Enhancing Construction Productivity
Proposal submissions are open from 27 Sep 2022 02:15PM to 1 Mar 2023 11:59PM